Hippocampus is a Bates Star Craft 33 from Shepperton on the Thames. She is coming to our Southwold yard to have a thorough refit. The proposed list of works includes repairing the teak decks and transom, design and installation of an outside helm position complete with a Brookland screen, revarnishing, repainting the hull, new covers, carpets, upholstery and furnishings plus the usual winter maintenance works.
Hippocampus, August 2021 update:
Hippocampus had a fantastic weekend at the Thames Traditional boat festival in Henley over the August bank holiday weekend and was awarded the Reardan Plate for the best Star Craft in show as voted by the owners association and the Star Craft Starter kit trophy for the most restoration completed in the previous year. She looked very pretty on the water and her new aft deck fly bridge looked totally in keeping with her beautiful shape.
Hippocampus, August 2021 update:
Paul made the journey to deliver and fit…the name sign and panels on aft seating area. She will be at Henley at the Thames Traditional boat festival.
Hippocampus, June 2021 update:
With the river trials successfully completed the new interior carpets and cushions were fitted and everything was put back together. It all came together in the end after a final push to finish. Then today we said farewell as she was loaded onto transport courtesy of our friends at Squirrel Marine and headed for the Thames. She looked fabulous in the sunshine as she left and the early part of the journey was made interesting by the fair in town!
Hippocampus, June 2021 update:
With the customers deadline looming it’s quite literally all hands on deck to get her finished. She has been in the tent for a few weeks and the engineering team have been busy sorting her steering and the marine electricians have been doing the wiring. It has been tricky to photograph her progress inside the tent but today I attempted to capture her freshly painted and varnished exterior. She is due to be finished this week!
Hippocampus, May 2021 update:
It has been a super busy few weeks on Hippocampus. With the wood work almost complete and ready to put back on board the engineering team were installing the steering system only to be set back with a faulty part. While we await a replacement there is no time to waste so the painter and finishers have moved her into the tent outside to complete the exterior painting. Unfortunately progress shots are not easy, and with unusually cold weather in May we have taken to using our winter heaters so the paint will cure. When she comes out again it will be like the great unveil!
Hippocampus, February 27th 2021 update:
While carrying out a few repairs on the deck we have uncovered some rot in the transom corners, Paul is in the process of doing a great repair job. From the pictures you can see the before and after. I love how crabbing buckets have their uses around the yard during this lockdown period in the absence of holiday makers in Southwold crabbing off the key!
Hippocampus December update: Hippocampus has now been moved into shed 1 for the works to begin.